電線桿生產(chǎn)過程是很繁瑣的。
發(fā)布:2025-03-10 來源: 作者: 評論:條 編審:admin 瀏覽量:11 操作>>
電線桿生產(chǎn)過程是很繁瑣的。要細(xì)心、嚴(yán)謹(jǐn)。針對每一個環(huán)節(jié)都要嚴(yán)把質(zhì)量關(guān)。生產(chǎn)車間的工人也是辛苦的。
Many people have not seen the production process of the pole. How to make the hollow in the middle? The production process of the pole is very complicated. Be careful and rigorous. We should strictly control the quality of every link. The workers in the workshop are also hard-working.
這是生產(chǎn)的原材料,中間的是鋼絲,遠(yuǎn)處的是沙子和碎石。
This is the raw material for production, steel wire in the middle, sand and gravel in the distance.
圖片
picture
1、首先需要將鋼絲盤直,屋子里面有一個盤條機,因為逆光沒有拍到,它把一捆一捆的鋼絲盤直。。
1. First of all, the steel wire needs to be straightened. There is a wire rod machine in the room. Because the backlight didn't shoot, it straightens the bundles of steel wire..
圖片
picture
2、根據(jù)電桿的長度,將盤直的鋼絲截成需要的長度,鋼絲是要做成水泥電線桿的配筋(相當(dāng)于緯線)。
2. According to the length of the pole, cut the coiled straight steel wire into the required length. The steel wire is to be made into the reinforcement of the cement pole (equivalent to weft).
圖片
picture
3、這就是水泥電桿的模具,兩半的。
3. This is the mold for the cement pole, two halves.
圖片
picture
4、把盤直的鋼絲每根電桿至少8根筋,我們公司為了穩(wěn)固都要求是12根筋(這可是多了不止一根筋,)。同時用細(xì)鋼絲盤成羅圈的緯線,環(huán)繞著作為緯線的鋼絲,結(jié)合的地方用鐵絲綁牢,這樣在模具中就有了水泥電桿的龍骨。然后用一定比例的水泥澆灌滿。
4. Each pole should have at least 8 steel bars. In order to be stable, our company requires 12 steel bars (this is more than one steel bar). At the same time, the weft wire coiled into a compass with thin steel wire is surrounded by the steel wire used as weft wire, and the binding place is bound with iron wire, so that the keel of cement pole can be found inmold. Then fill it with a certain proportion of cement.